Appreciation & Awards
Home - Appreciation & Awards
Certificate Of Appreciation
From Adani
Transmission
From Sterlite Power Transmission LTD
From Bajaj
Electrical LTD
Awards
Awards
Client
Testimonials
Innovation, Dedication, and Unmatched Service
NTPC - National Thermal Power Corporation Ltd.
01-11-1985
Jyoti Structures have fabricated 2,719 MT of various towers for Cuddapah - Madras S/c 400 KV Transmission Line. The fabricated towers have been erected satisfactorily.
Indian Railway Construction Company Limited - IRCON
22-05-1990
Jyoti Structures Limited have completed Hathras - Siarsaul and Hathras - Mithwali lines of this organization. These works have been completed in very efficient manner. We appreciate their cooperation.
Lloyds Steel Industries Limited
28-04-1993
We have awarded 220 KV Switchyard - coupled with 220 KV Transmission line contract for our Wardha Steel Project to Jyoti Structures Limited. The overall coordination and monitoring of project is quite satisfactory, high standards of quality consciousness, good sense of engineering and attitude of responsibility are being maintained by M/s Jyoti Structures Limited.
D. J. Lowrey, Md, Kilpatrick Green, Australia
22-12-1997
The Port Augusta to Olympic Dam Project has been very demanding to bring to completion in such a short time. We have managed to do that through not only the excellent efforts of our team, but through the very excellent performance of Jyoti.
John Fisher: Bureau Veritas
07-03-1995
There were a number of aspects of your operations, both in Bombay and Nasik, which impressed me. Firstly, the detail and control of incoming materials at Nasik, which provides linked traceability of all stock is impressive and valuable for the client. Secondly, the completeness and detail of Quality Assurance Department’s records, and, as importantly, the enthusiasm and pride that members of the department obviously take in the proper performance of their duties, both show an appreciation of the QA task, and confirm the commitment to its implementation and maintenance, Thirdly, the openness of all personnel and the availability of the records from previous contracts, confirms that the company's performance on its contracts is consistently successful, and that management did not set out to prevent access to any aspects of its operations.
Bernhard Motsch, Supply Manager, Transmission Lines Exports Abb, Germany
22-10-1997
Jyoti Structures is a well experienced company and very familiar with the Transmission Line Business. Jyoti Structures is able to do engineering works like tower design, execution of workshop drawings, execution of electrical engineering etc. The manufacturing plant at Nasik is well organized and capacity is high enough to handle large export projects with more than 20,000 tons etc. The machinery and equipment installed in Nasik is in a very good condition and the split between CNC Production and manual production is a good mixture. From all companies visited, Jyoti Structures seems to be the most experienced company with very qualified employees.
Simon Le Bars, Gm, Abb, Australia
02-04-1997
We were all extremely impressed with the quality and production at your factory and the dedication of the staff involved.
Tata International Limited
27-03-2000
(230 KV Krabi Thungson Transmission System for EGAG, Thailand) We are pleased to place on record our appreciation towards the successful completion of supplies much ahead of stipulated period, the extent of co-operation accorded and the cordial relationship sustained over the period.
Contract Administrator Societe D Energie De La Baie James, Montreal, Canada
08-08-2000
(Subsidiary of Hydro Quebec, the largest power utility in Canada) We are pleased to place on record our appreciation of Jyoti Structures Limited performance on Mantaro - Socabaya Transmission Line System Project, Peru related to supply of 20,000 MT of Transmission Line Towers and Sub-Station Structures, valued at US$ 12.3 million. All structures were supplied and were ahead of schedule. In recognition of their performance, we were glad to award them with bonus payments for early deliveries. During execution of the project we found JSL very customer focussed and service oriented.
Director, Procurement And Contracts Societ D Energie De La Baie James, Montreal, Canada
23-08-2000
(Subsidiary of Hydro Quebec, the largest power utility in Canada) We are pleased to affirm our satisfaction on the high level of professionalism demonstrated by your organization all along the execution of the contract for Lattice Steel Towers for Mantaro - Socabaya Transmission Line System Project, Peru. The Goods (20,000 metric tons of steel) were delivered two (2) months ahead of schedule and a bonus was awarded to Jyoti Structures Limited for their effort.Jyoti's world - class in - house facilities such as design, tower testing and manufacturing facilities have contributed to the success of the project.
Charles Sinclair, Commercial Manager, Kilpatrick Green, Australia.
23-05-2000
We are pleased to convey our satisfaction of JSL's performance on Pelican Point Project in South Australia. It was completed one month ahead of schedule. JSL's attention to customer focus and service deserves specific mention.
TSN (Transmission Sudeste Norodeste) Brazil
12-07-2001
We are pleased to note that Jyoti Structures Limited has qualified as export quality supplier for tower and substation steel structures. We have been more than impressed by the company's very efficient organization, professional personnel, steady production output and good performance records.
Karnataka Power Transmission Corporation Ltd
16-04-2003
The 400 KV Neelamangala - Srirampura - Talaguppa line has been successfully tied up with the grid on 12.04.2003. I thank you and all your staff engaged in this project for the successful completion of the line.
Power Grid Corporation Of India Limited
19-12-2004
(Charging of 400 / 220 KV Khandwa Substation) Power Grid wishes to appreciate and keep on records the efforts made by M/s Jyoti Structures Ltd for successful commissioning of Khandwa Substation.
Egyptian Co. For Metallic Construction
15-09-2005
We are pleased to place on record our appreciation of Jyoti Structures Limited on their performance for executing the projects related to Testing of our 500 KV and other towers. During the execution of the job, we found that JSL is very much customer focused and service oriented. JSL's testing station caters for full scale testing of towers up to 800 KV double circuit towers with state - of - the - art modern equipment.
Maharashtra State Electricity Transmission Co. Ltd.
16-06-2006
Jyoti Structures Ltd were awarded turn key contract for three substations under Latur Power Improvement System. The substations are in satisfactory operation since commissioning.
Ethiopian Electric Power Corporation
26-06-2006
We confirm having awarded three turn key contracts (total length 452 km) on Jyoti Structures Limited. During execution, JSL had maintained all the required safety standards. The contractor had all the necessary tools, plants and equipment to carry out the works and the quality of their materials and workmanship was satisfactory. All three projects have been executed successfully to our satisfaction and all the lines are in operation.
Edemtec S. A. De C. V., Mexico
12-07-2006
Reference test of the 400 KV 2 circuits prototype tower. I gladly recognize the quality of the services provided by Jyoti Structures Ltd of its personnel and its facilities. I do not omit to mention that we are absolutely satisfied by the received services and that we willingly will request your collaboration in future projects.
Power Grid Corporation Of India Limited
01-08-2006
T(Appreciation for assistance provided towards completion of 400 KV D/C Vishnuprayag - Muzaffarnagar Transmission Line)
This line passes through extremely difficult terrain in deep Himalayan ranges, traversing through deep valleys, thick forest, gorges valleys, involving extremely unfriendly weather conditions and treacherous terrain. Timely completion of this line was extremely important. When it became evident that with prevailing resources it will not be possible to complete the line in time, M/s Jyoti Structures Limited were called upon to provide their valuable assistance. JSL did come up with the valuable assistance in completion of the project in time. It is therefore, to place on record and acknowledge the invaluable assistance rendered by M/s Jyoti Structures Ltd in timely completion of Vishnuprayag - Muzaffarnagar 400 KV D/C Transmission Line..
West Bengal State Electricity Transmission Company Limited
16-05-2007
It is my pleasure that M/s Jyoti Structures Ltd, a consortium partner, entrusted with the work of 400 KV D/C line from Purlia Pumped Storage Project to Durgapur have successfully completed the line even after stiff way leave constrains at various locations. M/s Jyoti Structures Limited with their modern machineries for stringing work completed 117 KM of stringing work on their side for a total of 323 towers including two numbers 85 meter river crossing truncated tower. The second circuit of the line was charged and commissioned on 31.01.07
R. K. Madan, Adani Power
11-05-2011
During my recent visit to Ahmedabad, Shri. Gautam S. Adani at his own, has made a statement that Jyoti Structures Limited has performed very well for completing HVDC transmission line. Many thanks for completing such a gigantic transmission project successfully by mobilizing all the resources adequately.
Director And Principal Consultant, Lopez And Associates Enfineers, Consultants To San Diego Gas And Electric (Sdge), California
04-06-2012
I am happy to inform that the last tower of Sunrise Powerlink Project was erected on June 4, 2012. It was quite a challenge and is certainly a job well done. I am grateful to Jyoti for the incredible assistance over the last three years. You have been pushing the limits to help us and I'll never forget the support that you gave me.
Shri R. P. Singh, Cmd, Power Grid Corporation Of India
16-05-2007
(From his speech welcoming CM of Andhra Pradesh and Power Minister of India at the dedication ceremony of Jeypore - Gajuwaka Transmission System to Nation. The line was built by JSL)
I take pride to inform that this line is being commissioned 9 months ahead of schedule.
General Manager, Power Grid Corporation Of India Limited, Nagpur
This communication is to express my deep appreciation to you for deputing your team to the site on our call for urgent restoration of the important 400 KV Bhilai - Chandrapur line which crashed near Rajnandgaon. Your GM, Construction had been personally present to supervise the activities of restoration which resulted in expeditious completion of works. I once again express my gratitude towards timely help from your side.
Awards
Export
Innovation, Dedication, and Unmatched Service
India Trade Promotion Organization
1998 - 99
Certificate of Merit awarded to M/s Jyoti Structures Limited for the second highest exports to Latin American Countries during 1998 - 99 in the category of ' Engineering, Metallurgical and Electronic Products.
India Trade Promotion Organization
1999 - 2000
Certificate of Merit awarded to M/s Jyoti Structures Limited for highest exports to Latin American Countries during 1999 - 2000 in the category of ‘Engineering and Metallurgical’
Engineering Export Promotion Council, Mumbai
10-11-2000
Certificate of Export Excellence awarded to M/s Jyoti Structures Limited during the year 1998 - 99.
Engineering Export Promotion Council, Western Region
07-01-2001
Certificate of Export Excellence awarded to M/s Jyoti Structures Limited, in recognition of achieving highest export performance during 2000 - 2001 amongst the Non - SSI exporters in the panel Fabricated Steel Structures included Transmission Line Towers.
Engineering Export Promotion Council
09-01-2002
Award for Export Excellence. M/s Jyoti Structures Limited have been awarded All India Trophy for Top Exporters in the category of Engineering Consultancy, Technical Know-how and other Engineering Exporters in recognition of their outstanding contribution to engineering exports during 1999 - 2000.
Engineering Export Promotion Council, Western Region
02-02-2005
Jyoti Structures Limited has been awarded HIGHEST EXPORTER'S TROPHY in recognition of their outstanding contribution to engineering exports during 2001 -2002 in the category of Exports to New / Difficult Markets - NON SSI.
Engineering Export Promotion Council, Western Region
01-11-2011
Sponsored By Ministry of Commerce and Industry. M/s Jyoti Structures Ltd. have been awarded Trophy for STAR PERFORMER as Large Enterprise for their outstanding contribution to Engineering Exports during the year 2008-09.
Engineering Export Promotion Council, Western Region
05-03-2014
Sponsored By Ministry of Commerce and Industry TOP EXPORTER AWARD Jyoti Structures Limited have been awarded Special Trophy for Excellence in Engineering Process Outsourcing Services and their outstanding contribution to Engineering Exports during the year 2011 - 2012.
Awards
Corporate
Innovation, Dedication, and Unmatched Service
Dalal Street Investment Journal
1995
Corporate Excellence Awards 1995, Presented by the Governor, Reserve Bank of India, Dr. C. Rangarajan to Mr. K. R. Thakur, Chief Executive, Jyoti Structures Limited, in recognition of having ranked 98th among India's Top 200 Companies. GOVERNMENT OF INDIA, MINISTRY OF COMMERCE (1996 - 97) Certificate of Merit awarded to M/s Jyoti Structures Limited for outstanding performance in Capital Goods Exports during the period 1996-97.
Analyst Awards
1998
Jyoti Structures Limited is ranked 25th in the country with CAGR of 33.96 % based on past five years' performance. Initial investment of 3250 in March. 1993 became 14022.5 in March, 1998. In terms of Risk Adjusted Returns, Jyoti Structures ranked 15th in the country.
Financial Express
11-10-1998
Jyoti Structures was ranked 17th in the TOP 100 companies in the country.
Nashik Industries And Manufacturers' Association
12-01-1999
NIMA Excellence award is conferred upon M/s Jyoti Structures Limited.
Financial Express
09-02-1999
Jyoti Structures was ranked 48th among India's 408 Hottest Growth Performers based on their 5 - year record.